Fastener Logistics, Solved End to End.
From Factory Floor to Your Port.
One purchase order, multiple specialized factories, a single consolidated shipment. We combine bolts, nuts, washers, anchors and custom parts into one container -- with full export documentation, customs filing, and tracked delivery to 40+ destination markets.
ROUTE: XINGANG → HAMBURG
- Factory consolidation -- 5 sources, 1 warehouse DAY 0
- Pre-shipment inspection (AQL 0.65 + MTR 3.1) DAY 2
- Export customs declaration filed DAY 4
- Container loading -- 1×40HQ, 23.6 t TODAY
- Ocean transit -- est. 31 days ETA APR 09
One Order. One Container. Zero Multi-Supplier Chaos.
Factories each make a single category. We consolidate their output into one managed shipment -- engineered for distributors, OEMs and procurement agents who need flexibility, not friction.
Multi-Factory Consolidation
Bolts from one mill, nuts from another, anchors from a third -- all received at our Tianjin warehouse, matched to your packing list, and loaded as a single mixed-spec shipment.
Flexible MOQ & LCL Freight
Factory MOQs run 5-20 tons. We split that barrier down to 100 pieces per line item -- LCL for trials and reorders, 20GP/40HQ FCL for volume, air or express courier for urgent samples.
Complete Export Documentation
Commercial invoice, packing list, bill of lading, certificate of origin, EN 10204 3.1 MTR, fumigation-free ISPM-15 pallet declarations -- plus CBAM carbon data for EU-bound cargo.
Customs & Tariff Compliance
Export declaration handled in-house, HS codes verified against destination tariff schedules, and routes engineered around EU anti-dumping (stainless-focused) and CBAM reporting.
Six Controlled Steps, One Accountable Partner
-
STEP 01
Spec & Requirement Lock
Standard, grade, coating, quantity, packaging and destination port confirmed in writing before any cost is calculated.
OUTPUT: FIXED BOM + SPEC SHEET -
STEP 02
Freight & Landed-Cost Quote
FOB, CFR/CIF or DDP pricing with freight, insurance and local charges itemized -- no hidden cost lines later.
RESPONSE: ≤ 24 HOURS -
STEP 03
Production & Consolidation
Partner factories ship to our Tianjin warehouse on a shared deadline; every lot is labeled and matched to your order.
CYCLE: STOCK 7D • PRODUCTION 15-25D -
STEP 04
QC & Pre-Shipment Inspection
AQL 0.65 inspection with photos and video, retained samples per lot, and MTR 3.1 verification before anything is loaded.
EVIDENCE: PHOTOS • VIDEO • SAMPLES -
STEP 05
Booking, Customs & Loading
Vessel space booked in advance, export declaration filed, container loaded to a documented load plan and sealed on camera.
RELEASE: B/L + FULL DOC PACK -
STEP 06
Tracking & After-Sales
Milestone tracking to your port, arrival support for destination clearance, and a 30-day window for any claim resolution.
COVER: 30-DAY CLAIM WINDOW
Packed for 40 Days at Sea, Not Just the Factory Gate
- Export-grade cartons ≤ 25 kg double-wall kraft, palletized on fumigation-free ISPM-15 plywood pallets -- accepted at EU, US and AU quarantine checkpoints.
- VCI anti-rust film + desiccant inside every carton for HDG, zinc-plated and stainless cargo against ocean condensation.
- Private label, barcodes & kitting retail-ready packs and FBA-compliant labeling for brand owners and e-commerce replenishment.
- Documented container load plan weight distribution optimized for dense cargo; every position photographed before the container is sealed.
NOTE: Fasteners are dense cargo -- 20GP heavy-duty containers recommended for full-weight lots; 40HQ for volume-optimized mixed shipments.
Clear Terms Before You Commit. Coverage Where You Sell.
EXW • DDP
30 + 70 TT (Repeat)
Production 15-25 Days
35 km from warehouse
Available on request
| Region | Sea Transit | Routing Notes | Focus Cargo |
|---|---|---|---|
| Southeast Asia | 7-12 days | Priority lanes -- Vietnam, Thailand, Indonesia; very LCL-friendly | Standard carbon steel + solar PV fasteners |
| Middle East | 18-25 days | Jebel Ali & Dammam hubs for GCC infrastructure programs | 316L / duplex 2205 corrosion-resistant lines |
| Russia & CIS | 20-30 days | Sea + China-Europe rail multimodal options | High-tensile 10.9 / 12.9 replacement supply |
| Africa | 30-40 days | Reinforced packaging; secure payment terms applied | Construction series, anchors, HDG hardware |
| European Union | 28-35 days | Anti-dumping-aware routing; CBAM carbon documentation ready | Stainless A2/A4 -- exempt from carbon-steel AD duty |
| United States | 14-18 days (WC) | Section 301/232 tariff lines quoted transparently pre-order | Certified high-tensile with full MTR traceability |
Transit times are indicative port-to-port and confirmed per booking. Air freight and DHL/FedEx courier available for samples and urgent line-down stock.
What Happens When Something Goes Wrong?
Here's Our Answer.
On-Time Dispatch System
Weekly production follow-up, vessel space booked before goods are ready, and a backup factory qualified in every category -- if one line fails, capacity switches without blowing your deadline.
Evidence-Backed Shipments
Pre-shipment inspection with photos and video of goods, cartons, palletizing and container sealing. Retained samples kept per lot, paired with EN 10204 3.1 MTR for traceability.
After-Arrival Protection
A written 30-day claim window after arrival. Verified evidence -- photos, video or third-party report -- triggers replacement, credit note or discount compensation. No silent treatment.
Payment & Cargo Risk, Covered
New accounts: 100% TT advance with inspection evidence before shipment. Repeat accounts: 30% deposit + 70% against B/L copy. ICC (A) all-risk marine insurance available on any CIF/DDP order.
Price a Route or Plan a Consolidated Shipment
Send your BOM, destination port and target Incoterm. We return itemized freight, insurance and landed-cost figures with a confirmed lead time -- within 24 hours.
Landed-Cost Transparency
Product, freight, insurance and origin charges itemized -- the quote never mutates after booking.
No Supplier Bypassing
Strict NDA discipline and blind-shipment handling -- your end customers stay yours.
35 km From Xingang Port
Short drayage from our consolidation warehouse cuts both cost and cutoff risk.